- Kneader series
- Grinding and Dispersing series
- Mixing and kneading series
- Pressure Vessel Series
- Dry powder mixer series
- High viscosity mixing series
- Stirring and dispersing series
- Emulsifying homogeneous series
- Grinding series
- Filter series
- Large storage and pressure vessel series
- Boiler&Heat-conducting oil furnace series-4
- Centrifuge machine
- Chemical plant production line
- Mine Car & Wheel Set
- Mine Locomotive
- Mining Man Car
- Diesel Locomotives
- Muck Shovel Loader
- Mucking Machine
- Rock Loader
- Scraper Conveyer
- Belt Conveyor
- Air Compressor
- Ventilation Equipment
- Roadheader Machine
- Mining LHD
- Coal Shearer
- Mine Car Dumper
- Mining Electric Appliance
- Mine Communication
- Gas Drainage Pumping Station
- Rail Catcher
- UNI-T UTi165K Infrared Thermal Imaging Camera Digital Imagining Camera
- UNI-T UTi85H+ Infrared Thermal Imaging Digital Camera
- Dynamic Face Recognition and Thermometry Terminal
- Non-Contact Infrared Thermometer
- Face recognition body temperature detector
- Non Contact Infrared Thermometer
- Body temperature scanner with disinfection machine in public place
- Face recognition temperature measurement and disinfection machine
- Steel Rail
- Track Switch
- Rail Transit Equipment
- Rail Transit Equipment
- Rail Arrester
- Seamless Steel Pipe
- Railway Sleepers
- Railway Parts
- Mining Steel
- Steel Plate & Steel Sheet
- Steel Shot
- U Channel Steel Support
- Hydraulic Acrow Props
- Hydraulic Roof Supports
- Hinged Bar
- Anchor Bolt
- Anchor Agent
Chemical Equipment
Mining Equipment
Human Infrared Thermal Imaging
Thermometer
Robot
Railway Equipment & Steel Rail
Drilling Equipment
Supporting Equipment
Lifting Equipment
Safety & Protection Equipment
Railway Dowty Retarder
Product introduction
TDR601 new Rail Retarder (hereinafter referred to as Retarder) is designed to meet the performance parameters in TB / T2460-93 standard basis, security Installation, maintenance convenience as the main design direction.


Railway Dowty Retarder
Product features
no.1
Compact, small body, do not climb when installing ballast.
Railway Dowty Retarder
Ultra short fuselage, compact structure
no.2
The quality of retarder is 6.9 kg, light weight, greatly reducing the workload of maintenance personnel to install and maintenance.



no.3
The abolition of the traditional mushroom head, avoid topping phenomenon, longer life, saving the maintenance workload and maintenance costs.

no.4
Hand in hand with a ring seal cover, easy accessibility, to extend the service life of the sealing cap.
Heavy duty, single acting, serviceable damper designed to slow the return of the wing rail on spring frog switches. Spring frog switches are usually remotely located. The spring loaded wing rail is biased to the main track, so as the wheels of trains approaching on the side track hit the wing rail, it springs open to allow the train through. The damper slows the return of the rail for about 30 seconds thus reducing the number of wheel/rail impacts and so reducing wheel/rail wear.


Railway Dowty Retarder
Product parameter
Critical Speed(m/S) | 1.25 | 2 | 2.5 | 3 | 3.5 | 4 |
Braking Power(j) | 750 | 800 | 830 | 874 | 900 | 930 |
Resistance Work(j) | ≤35 | ≤35 | ≤40 | ≤40 | ≤45 | ≤45 |
Lift Height(mm) | ≤8 | ≤8 | ≤8 | ≤8 | ≤8 | ≤8 |
Railway Dowty Retarder
Custom Visit
Warmly welcome more domestic and overseas enterprises visit Our Group for cooperation, China Coal Group is willing to work with you to create a better future!




Russian businessmen visited the Shandong China Coal Group Joint Manufacturing Company
Product Feedback
History Feedback: (3)
Latest Feedback